MSADVANCE LOGO
✕
  • Services
  • About Us
  • Blog
  • Contact
  • English
    • Español
    • English
  • Services

    Collaboration is the key to business success.

    Migración entre tenants Microsoft 365

    Microsoft 365 Migration

    Azure Cloud Architecture

    Azure Cloud Architecture

    Modern Workplace

    Security and Compliance

  • About Us
  • Blog
  • Contact
  • English
    • Español
    • English
Published by MSAdvance on October 3, 2025
Categories
  • Google Workspace Migration
  • Microsoft 365 Migration
Tags
  • Calendar Interop
  • calendar migration
  • cloud migration
  • coexistence
  • contacts migration
  • delta migration
  • Directory Sync
  • DKIM
  • DMARC
  • email migration
  • email security
  • GCDS
  • Google Workspace Migrate
  • GWMMO
  • hyper-care
  • migrate Microsoft 365 to Google Workspace
  • migrate Office 365 to Google
  • migration checklist
  • migration KPIs
  • migration waves
  • MX cutover
  • OneDrive to Drive
  • pilot migration
  • SharePoint to Drive
  • SPF
  • technical discovery

Migrate from Microsoft 365 to Google Workspace with GWMME (2025) — a step-by-step, zero-downtime guide

Imagine you’re Marta, an IT lead at a growing company. Your email and calendars live in Microsoft 365, but the business has chosen Google Workspace to unify collaboration and cut costs. How do you make the switch without stopping mail, without losing meetings, and without waking up at 3 a.m. to an NDR? This guide tells that story, with a clear, human, and actionable plan built on Google Workspace Migration for Microsoft Exchange (GWMME), well-designed coexistence, and wave-based execution with delta.

Updated: October 3, 2025

Want to move to Google Workspace without downtime? Talk to us

At MSAdvance we combine native Google tools, coexistence configurations, and responsible scripting to migrate from Microsoft 365 with risks, timelines, and costs under control.

Contact us Google Workspace migration services

Table of contents — Migrate from Microsoft 365 to Google with GWMME

  1. Executive summary & KPIs
  2. What GWMME is and when to use it
  3. Glossary — Google org, domains, and routing
  4. Phase plan — suggested timeline
  5. Technical discovery: identity, mail, files, meetings
  6. Coexistence: mail (dual/split) and Calendar Interop
  7. Pilot with GWMME: validations and tweaks
  8. Waves with GWMME and delta — step by step
  9. MX cutover & security: SPF, DKIM, and DMARC
  10. Identity & provisioning: GCDS/Directory Sync
  11. Common risks and mitigations
  12. Printable checklist — Go-Live and after
  13. Tools: GWMME, GWMMO, Workspace Migrate
  14. Governance, comms, and support (hyper-care)
  15. Typical issues and fixes
  16. Migration success KPIs
  17. Costs and licensing — avoid double paying
  18. Lessons learned
  19. Final recommendations
  20. Frequently asked questions
  21. Official links and references
  22. Business-oriented conclusion

Executive summary — Microsoft 365 → Google migration with GWMME

Before diving in, let’s put the map on the table. Migration isn’t “a button”; it’s a choreographed sequence. Here we concentrate what you’ll achieve and how you’ll measure it.

GWMME is Google’s utility to bulk-migrate mail, calendars, and contacts from Exchange/Office 365 or IMAP to Google Workspace, admin-guided and suitable for hundreds or thousands of users by batch.

  • When to use it: when your focus is mail and calendars (80% of the pain in a migration). For files (OneDrive/SharePoint → Drive) combine with Google Workspace Migrate.
  • Recommended strategy: coexistence (dual/split delivery) + Calendar Interop + wave-based pre-stage and delta + MX cut at the end + gradual DMARC tightening.
  • Indicative KPIs: success ≥ 99%, NDRs < 0.5% after MX change, tickets < 0.1 per user during hyper-care, cutover window < 2 h per wave, and stable GB/h.

With this guide you’ll turn a “risk” into a measurable, predictable project.

What GWMME is and when to use it

If GWMME were a person, it’d be that methodical migration tech who never skips a step. It’s designed to move email, calendars, and contacts from Exchange Online/Server or IMAP to Google Workspace, with filters, reports, and retry capability without drama.

The tool runs on managed Windows machines (a server or a powerful workstation), authenticates to Exchange (EWS/Graph as applicable) and to Google, and executes bulk imports with throughput control. It doesn’t move files; that’s where Google Workspace Migrate (Drive and shared drives) comes in.

When not to use GWMME? If you have very few users and self-service matters, Data Migration Service or even GWMMO (for local Outlook cases) may be enough. For mid-size and large organizations, GWMME + Workspace Migrate is the winning pair.

Glossary — Google organization, domains, and routing

A bit of shared language avoids misunderstandings during the project. These are the pieces you’ll move:

  • Google Workspace organization: your Google “tenant”: users, groups, OUs, domains, and policies.
  • GWMME: a server-side tool to migrate mail/calendar/contacts from Exchange/Office 365/IMAP.
  • Google Workspace Migrate: platform to migrate content (OneDrive/SharePoint → Drive), with mappings and batches.
  • Dual delivery / split delivery: rules to route mail to Google and/or the legacy system during transition.
  • Calendar Interop: a free/busy availability bridge between Google Calendar and Exchange Online.
  • Delta: incremental pass to bring recent changes after pre-stage.

Phase plan — suggested timeline

A migration project is like moving offices: first you pack what you don’t use daily, then you move by floors, and at the end you change the sign on the door. Here the “door” is your MX record.

3-phase plan to migrate Microsoft 365 → Google Workspace
PhaseGoalKey tasks
1. PlanningReduce risk and prepare coexistenceInventory; decide dual/split delivery; Calendar Interop; lower TTL; validate GWMME permissions; map mailboxes → Google accounts; comms plan
2. ExecutionMigrate in waves with deltaPilot; GWMME waves (pre-stage + delta); telemetry and support; Drive with Workspace Migrate (if applicable)
3. Cutover & stabilizationSwitch MX and close coexistencePoint MX to Google; enable DKIM; DMARC at p=none and harden; full verification; retire legacy rules/connectors; optimize licenses

The timeline adapts to your size and business windows, but the order rarely changes.

Technical discovery: identity, mail, files, and meetings

Before you touch anything, Marta and her team draw a map. What you don’t measure tends to “break by surprise.” Here’s your discovery script:

  • Identity: decide how you’ll create accounts in Google: CSV, Google Cloud Directory Sync (GCDS) if you have on-prem AD, or Directory Sync (cloud service) if you prefer less infrastructure.
  • Mail: inventory mailboxes, aliases, shared mailboxes, permissions (send-as, full access) and transport rules. Verify EWS/Graph connectivity.
  • Calendar: identify rooms and critical meetings. Calendar Interop prevents turning calendars off and on blindly.
  • Files: volume in OneDrive/SharePoint, permissions, and external links. Plan with Workspace Migrate.
  • DNS/Security: external senders (marketing, ERP), SMTP devices, and your plan for SPF, DKIM, and DMARC.

The discovery goal is simple: nothing should catch you off guard on cutover day.

Coexistence: mail (dual/split) and Calendar Interop

Coexistence is the bridge that lets you cross the river without hanging up the phone. Configure dual or split delivery so that, for weeks, mail lands in both worlds according to your rules (by OU, domain, or groups). That way you can migrate in waves without anxiety.

For calendars, enable Calendar Interop. People still on Microsoft 365 will see free/busy for those already on Google, and vice versa. Result: fewer “can you do Tuesday?” threads and more focus on work.

Pilot with GWMME: validations and tweaks

The pilot is the “trial by fire” with real users. It covers heavy users, special permissions, and tight calendars. In this phase you’re looking for predictable issues, not late-night heroics.

  • Select 10–30 accounts: big mailboxes, shared, resources, and “complicated” users.
  • Check the service account: access to EWS/impersonation where applicable.
  • Validate folders, categories, contacts, invitations, and calendar resources.
  • Rehearse the delta: rerun GWMME to capture the last few days and measure timings.
  • Collect feedback: Gmail/Calendar UX, mobile clients, and change notifications.

The pilot produces playbooks and checklists you’ll reuse in every wave.

Waves with GWMME and delta — step by step

This is where the machinery starts rolling. Think trains: each wave departs on time, with its passenger list and its conductor.

1) Wave preparation

Create a source→destination CSV mapping (UPN/SMTP → Google account), define date filters (for example, pre-stage “> 24 months”) and lower the TTL of critical records well in advance. Enable coexistence for that group.

2) Execution (pre-stage 90–95%)

Run GWMME to bring most of the mailbox and calendar without changing MX. Control concurrency (threads/sessions) to avoid Microsoft 365 throttling and monitor performance (GB/h per server).

3) Delta + identity switch within the wave

During the cutover window, rerun GWMME only for the “recent” slice (last 7–14 days) and validate sensitive calendar items. Communicate the client change (Gmail/Calendar/Contacts) and disable forwards/rules on the source.

4) Wave closure

Do QA by sampling (mail, events, contacts), check for NDRs, and mark the wave “complete” in your dashboard. Users keep working; you sleep better.

MX cutover & security: SPF, DKIM, and DMARC

The MX change is when you hang the new sign on the door. Do it when most (or all) of the cohort is already on Google and your tests are solid.

  • MX: point the domain to Google’s mail servers when it’s time. Keep TTL low (300–600 s) 48–72 h beforehand to speed propagation.
  • SPF: include _spf.google.com and all legitimate senders (marketing, ERP, SaaS, devices).
  • DKIM: generate and enable keys from the Google Admin console; verify it signs correctly.
  • DMARC: start with p=none (monitoring) and, with data in hand, step up to quarantine and then reject gradually.

Practical tip: don’t bundle major changes (MX + DMARC reject) on the same day. Small, safe steps.

Identity & provisioning: GCDS / Directory Sync

If mail is the blood, identity is the circulatory system. Without correct users and groups, nothing flows. Pick your sync mechanism and get it “green” before each wave.

  • GCDS (on-prem): syncs from Active Directory to Google (users, groups, OU→OU). Ideal if you maintain local AD.
  • Directory Sync (cloud): Google-managed service to sync from Azure AD/Entra ID or other directories without your own servers.
  • Best practices: define attribute mappings, test in a lab OU, and document the rollback (in case a rule must be undone).

Common risks and mitigations

No plan survives first contact intact. What matters is anticipating and having a Plan B. This table is your pocket manual.

Risks and how to manage them
RiskSymptomPreventionPlan B
EWS throttlingUneven speed / 429 errorsLimit concurrency; night windowsReduce threads; split waves; staggered retries
Insufficient permissionsInaccessible mailboxesService account with correct roles; pre-testingAdjust permissions; isolated cases with GWMMO
NDRs after MX451/550 bouncesLow TTL; proven coexistenceTemporary forwards; monitor 24–48 h
Desynced calendarsMeetings “disappear”Calendar Interop before cutoverRecreate key events; proactive comms
“Large” or corrupt itemsSkipped messagesSize and date filtersExport and analyze cases; inform the user

Printable checklist — Go-Live and post-migration

Print this and tick boxes. Peace of mind is also a process.

Essential checklist
AreaItemStatus
CoexistenceDual/split delivery configured and tested□
CalendarCalendar Interop working (free/busy tests)□
GWMMEPermissions and connectivity verified; CSV template ready□
WaveUsers informed; window and support confirmed□
DNSTTL lowered; MX change plan approved□
SecurityDKIM active; DMARC at p=none (tighten T+7–14 days)□
FilesWorkspace Migrate plan (OneDrive/SharePoint→Drive)□
SupportHyper-care 48–72 h and dedicated channel□
LicensesPlan to remove duplicates after T+7 days□

Tools — native Google and complementary

Not every migration is solved with a hammer. Here are the pieces in your toolbox:

  • GWMME: bulk migration of mail, calendars, and contacts from Exchange/Office 365/IMAP. Documentation · Download · Release notes
  • GWMMO (Outlook): for user-by-user exceptions that require importing PST/Outlook. Download
  • Google Workspace Migrate: files (OneDrive/SharePoint) → Drive/shared drives. Guide
  • Data Migration Service: console option for email if the scenario is simple. More info

Governance, communication, and support (hyper-care)

Technology is only half. The other half is people. A good comms plan multiplies success.

  • Role-based messages: send “what changes for me” to office, field, IT, and middle management.
  • Champion network: reference users per area to test, spread the word, and help on day D.
  • 48–72 h hyper-care: dedicated channel, clear SLAs, first-access tutorials, and follow-up by wave.
  • Telemetry: single dashboard with GB/h, batch success, NDRs, tickets, and satisfaction.

Frequent incidents and how to resolve them

Common problems have common solutions. If it rings a bell, here’s the recipe:

  • Hidden forwarding rules: mail “disappears” after cutover. Fix: pre-migration audit and cleanup; communicate the new flow.
  • Resources and shared mailboxes with complex permissions: inconsistent access. Fix: inventory before the pilot; verify after the wave.
  • Giant or corrupt attachments: some messages are skipped. Fix: size filters; inform the user and alternatives (Drive).
  • Old mobile clients: active Exchange profiles. Fix: reconfiguration guides (Gmail/Calendar/Contacts) and, if needed, remote wipe.

Migration success KPIs

What you don’t measure you can’t improve. Use these indicators to steer the conversation with the business:

  • First-attempt success (≥ 99%).
  • NDRs < 0.5% within 48 h after MX change.
  • Tickets < 0.1 per user during hyper-care.
  • Performance (GB/h) per server/wave.
  • Cutover window < 2 h per wave.
  • Satisfaction ≥ 8/10 in the post-wave survey.

Costs and licensing — how to avoid double paying

Savings don’t come from “changing tools” alone. You achieve them with timing, order, and data:

  • Plan a grace window between assignment in Google and retirement in 365.
  • Consolidate SKUs in Google and remove redundant add-ons after stabilization.
  • Use usage/license reports to detect inactivity and reassign.
  • Coordinate with Procurement to co-terminate contracts and avoid overlap.

Lessons learned

After dozens of migrations, some constants repeat. A candid summary for your black box:

  • Pilot with heavy users: saves surprises in calendars and huge mailboxes.
  • Compliance first: holds and legal blocks must be identified before, not during.
  • Assume inevitable fix-ups: categories, resources, and duplicate contacts will require clear playbooks.
  • Single telemetry: decide with real-time data, not “feelings.”
  • Domain at the end: MX is the last step, not the first.

Final recommendations for migrating with GWMME

If you started tomorrow, you’d start like this:

  • Define waves of 100–200 users by area/office.
  • Apply pre-stage and then delta in short windows.
  • Publish KPIs before kickoff and set up a control room with IT/business/support.
  • Delay the MX change until the source is clean and external senders aligned.
  • Be ready for a per-wave rollback (rules, forwards, aliases) even if you rarely use it.
  • Mind identity: GCDS/Directory Sync ready and tested.

Frequently asked questions — migrating from M365 to Google with GWMME

Does GWMME also migrate files?

No. GWMME focuses on mail, calendar, and contacts. Use Google Workspace Migrate for files to Drive/shared drives.

Big bang or waves?

Waves minimize risk and allow learning. Big bang only fits low volume with a wide business window.

Can I keep calendars working cross-platform during the transition?

Yes. With Calendar Interop you’ll see free/busy availability between Google and Exchange Online until everyone is on Google.

When should I move the domain/MX?

At the end. First coexistence and waves, then MX. You’ll avoid NDRs and protect domain reputation.

Official links and references

  • GWMME: official documentation
  • GWMME: download
  • Google Workspace migration guides
  • Google Workspace Migrate (files)
  • Set up MX records in Google
  • SPF in Google Workspace
  • Sign email with DKIM
  • Protect the domain with DMARC
  • Google Cloud Directory Sync
  • Directory Sync (cloud)
  • Calendar Interop

Business-oriented conclusion

Migrating from Microsoft 365 to Google Workspace with GWMME isn’t about “moving emails”; it’s about moving how you work. With a coexistence bridge, delta-based waves, and well-orchestrated DNS, the change happens without the business noticing… except for the improvements: lower costs, less friction, more focus. If you need expert hands, we’re here to partner with you at every step.

Want us to design your Google Workspace migration?

We define waves, automate tasks, and accompany you through execution and hyper-care with clear KPIs and full traceability.

Contact us Google Workspace migration services

Migrate from Microsoft 365 to Google Workspace with GWMME (2025) — step-by-step guide
Share
29

Related posts

November 15, 2025

Microsoft 365 tenant-to-tenant migration: a complete guide


Read more
October 22, 2025

Microsoft 365 Migration (2025): complete end-to-end strategy — CSV, Endpoint, DNS, performance, security & adoption


Read more
October 22, 2025

Microsoft Entra ID (Azure AD) Migration 2025: Complete Guide and Zero Trust Strategy


Read more
October 18, 2025

Why Companies Migrate from Google Workspace to Microsoft 365


Read more

Do you have an idea, a challenge, or a specific business need?

Speak with our experts about your next big project

This is only a glimpse of what we can do. Whatever you have in mind—no matter how unique or complex—we are ready to turn it into reality.

info@msadvance.com

Contact Us

Services

About Us

Blog

Cookies Policy

Privacy Statement

Legal Notice / Imprint

© 2025 MSAdvance | All rights reserved worldwide

MSAdvance
Gestionar consentimiento
Para ofrecer las mejores experiencias, utilizamos tecnologías como las cookies para almacenar y/o acceder a la información del dispositivo. El consentimiento de estas tecnologías nos permitirá procesar datos como el comportamiento de navegación o las identificaciones únicas en este sitio. No consentir o retirar el consentimiento, puede afectar negativamente a ciertas características y funciones.
Funcional Always active
El almacenamiento o acceso técnico es estrictamente necesario para el propósito legítimo de permitir el uso de un servicio específico explícitamente solicitado por el abonado o usuario, o con el único propósito de llevar a cabo la transmisión de una comunicación a través de una red de comunicaciones electrónicas.
Preferencias
El almacenamiento o acceso técnico es necesario para la finalidad legítima de almacenar preferencias no solicitadas por el abonado o usuario.
Estadísticas
El almacenamiento o acceso técnico que es utilizado exclusivamente con fines estadísticos. El almacenamiento o acceso técnico que se utiliza exclusivamente con fines estadísticos anónimos. Sin un requerimiento, el cumplimiento voluntario por parte de tu proveedor de servicios de Internet, o los registros adicionales de un tercero, la información almacenada o recuperada sólo para este propósito no se puede utilizar para identificarte.
Marketing
El almacenamiento o acceso técnico es necesario para crear perfiles de usuario para enviar publicidad, o para rastrear al usuario en una web o en varias web con fines de marketing similares.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
Ver preferencias
  • {title}
  • {title}
  • {title}